LESCO New Connection Demand Notice Fee

LESCO New Connection Demand Notice Fee

LESCO New Connection Procedure and Fees in Lahore

Getting a new electricity connection in Lahore through LESCO (Lahore Electric Supply Company) can seem confusing. Whether you are building a new home, opening a business, or relocating, understanding the lesco new connection demand notice fee and application process is essential. This guide explains everything in detail to help you navigate the procedure quickly and efficiently.

Understanding LESCO New Connection

A LESCO new connection is the process of applying for an electricity supply for properties not currently connected to the grid. The process involves submitting an application, paying the applicable fees, and completing technical requirements.

Who Needs a New Connection?

New electricity connections are typically required for:

  • Newly constructed residential houses
  • Commercial or industrial properties
  • Renovated or restructured properties
  • Relocated tenants or businesses

Knowing this helps you determine the type of connection and applicable fees.

LESCO New Connection Procedure

The LESCO new connection procedure has several steps. Following them correctly ensures faster approval.

Application Submission

The first step is submitting a formal application. You can do this online or at your nearest LESCO office. The application requires:

  • National Identity Card (CNIC) copy
  • Property ownership documents or rent agreement
  • Property address and location details
  • Electrical load requirements

Providing accurate information reduces delays in processing.

Site Inspection

Once your application is submitted, LESCO will schedule a site inspection. A technician will verify the property, its electrical setup, and load requirements.

  • Ensure easy access for inspectors
  • Prepare property layout and wiring details
  • Discuss load capacity to avoid future adjustments

Demand Notice Issuance

After inspection, LESCO issues a demand notice, which includes the total lesco new connection demand notice fee. This fee is based on your property type, connection load, and location.

  • Residential connections have lower fees
  • Commercial or industrial connections require higher fees
  • The notice also includes charges for security deposit and meter installation

Paying the demand notice promptly avoids connection delays.

Fee Payment

Payment can be made online or at designated bank branches. After payment, keep the receipt for verification.

  • Residential fees usually range from PKR 2,500 to 15,000
  • Commercial connections can exceed PKR 50,000 depending on load
  • Some areas may include additional infrastructure charges

Meter Installation

LESCO schedules meter installation after fee verification. Ensure that:

  • Your electrical system is ready and safe
  • The installation site is accessible
  • You are available for final inspection

Once installed, your electricity connection becomes active.

Factors Affecting LESCO Connection Fees

Several factors influence the lesco new connection demand notice fee:

Load Requirements

Higher electrical loads require stronger infrastructure, which increases fees.

Property Type

Residential, commercial, and industrial connections have different tariffs.

Distance from Grid

Remote locations may need additional wiring, raising costs.

Security Deposit

LESCO may require a refundable security deposit based on connection type.

Understanding these factors helps estimate your connection cost accurately.

How to Check LESCO Demand Notice Online

You can check your demand notice conveniently using LESCO’s online portal. This helps you:

  • View fee breakdown
  • Confirm charges before payment
  • Save time by avoiding in-person visits

For instant verification, use the Lesco Online Bill Check feature. This ensures all charges are clear and up-to-date.

Tips for a Smooth LESCO Connection

  • Submit complete and accurate documents
  • Confirm property ownership and legal papers
  • Pay the demand notice quickly
  • Ensure electrical wiring is ready before meter installation
  • Keep all receipts and reference numbers for follow-up

Following these steps avoids delays and ensures a hassle-free connection.

FAQs About LESCO New Connection

What is the LESCO new connection demand notice fee?

The lesco new connection demand notice fee is a payment issued after site inspection. It includes meter installation, security deposit, and infrastructure charges. Residential fees are lower than commercial connections.

How long does it take to get a LESCO connection in Lahore?

Typically, a residential connection takes 7-15 days after application, depending on inspection and fee payment. Commercial connections may take longer.

Can I apply for LESCO online?

Yes, LESCO provides an online application portal. Submit documents digitally and track the application status easily.

How is the connection fee calculated?

The fee is based on load requirements, property type, distance from grid, and additional infrastructure charges.

Is there a security deposit for a new LESCO connection?

Yes, LESCO charges a refundable security deposit depending on connection type. It is included in the demand notice fee.

How can I check my LESCO demand notice status?

Use the Lesco Online Bill Check feature or visit the nearest LESCO office to verify the status of your demand notice.

Can commercial and industrial connections have different procedures?

Yes, commercial and industrial properties require higher loads and may need specialized transformers, affecting both process and fees.

Getting a LESCO new connection in Lahore doesn’t have to be complicated. By understanding the lesco new connection demand notice fee, following the proper procedure, and preparing required documents, you can get your electricity supply quickly and efficiently.