IESCO New Connection Process and Application Form Guide
Getting an electricity connection from IESCO (Islamabad Electric Supply Company) can seem confusing at first. But with the right guidance, it becomes a straightforward process. Whether you’ve built a new house, started a business, or need an additional meter, understanding the IESCO new connection demand notice fee and application procedure helps you avoid unnecessary delays. This detailed guide explains everything — from applying online to paying the demand notice, verification, and final meter installation — ensuring a smooth experience.
IESCO serves Islamabad and surrounding regions including Rawalpindi, Attock, Chakwal, and Jhelum. If you fall under this area, this guide is for you. Let’s explore how you can apply for a new electricity connection step by step.
Understanding the IESCO New Connection System
IESCO provides electricity connections under NEPRA regulations. The process ensures fair access and standard fees for all applicants. Every new connection request goes through specific stages: application submission, demand notice issuance, payment verification, and final meter installation. Each stage has a purpose — ensuring the system’s safety, accuracy, and proper billing.
The IESCO new connection demand notice fee depends on your connection type and load requirement. Residential users usually pay less, while commercial or industrial setups have higher fees.
Step-by-Step Guide to Apply for a New IESCO Connection
Visit the ENC (Electricity New Connection) Portal
To simplify the process, IESCO uses an online system called the Electricity New Connection (ENC) portal. Visit enc.com.pk and select “Apply for New Connection.” This portal is user-friendly and ensures your data reaches IESCO directly.
Fill Out the Online Application Form
You’ll be asked to fill in important details like:
- Applicant’s full name
- CNIC number
- Mobile number
- Permanent and current address
- Connection type (domestic, commercial, or industrial)
- Load requirement (in kW)
Make sure to double-check your entries. Even a small mistake in address or CNIC can delay your application.
Upload Required Documents
To verify your identity and ownership, IESCO requires a few documents:
- Copy of CNIC (front and back)
- Proof of property ownership (registry, allotment letter, or rent agreement)
- Attested affidavit on stamp paper (stating no previous connection or outstanding dues)
- Neighbour’s reference number (for verification)
- Site sketch or location map of your premises
Upload clear scanned copies. Blurry or incomplete files often result in rejection.
Submission and Application Tracking
Once submitted, the system provides an application tracking ID. Keep this ID safe — you’ll use it to check progress later. You can easily track your status through the ENC portal anytime.
Site Verification
After submission, an IESCO representative will visit your location. This step confirms your details, assesses wiring readiness, and checks the feasibility of the new connection. Make sure your site is ready before this visit — having a proper meter box and wiring in place saves time.
Demand Notice Issuance
If your site passes inspection, IESCO issues a demand notice. This document outlines the IESCO new connection demand notice fee, which includes meter charges, service connection cost, and security deposit. The demand notice is usually generated within 7–14 working days after verification.
Pay the Demand Notice Fee
Payment is the most important step. You can pay the IESCO new connection demand notice fee at any authorized bank or through online banking channels. Always keep a copy of the paid receipt.
Once paid, upload the payment proof to the ENC portal for verification. This ensures IESCO knows you’ve completed your payment and can proceed to the next step.
Meter Installation
After payment verification, IESCO installs your electricity meter. The process may take 10–15 days, depending on workload and location. You’ll receive a notification when the connection becomes active.
IESCO Demand Notice Fee Details
The IESCO new connection demand notice fee varies according to connection type and load demand. Here’s an approximate breakdown:
- Domestic connections (1-phase): PKR 5,000–8,000 (including meter, service line, and security deposit)
- Commercial connections (3-phase): PKR 15,000–25,000
- Industrial or large load setups: Fee depends on load (per kW cost and transformer installation, if required)
These are indicative figures; exact charges appear on your demand notice.
How to Check Your IESCO Demand Notice Status
You can track your demand notice online using your application tracking ID. Simply log in to the ENC portal and select “Track Application.” The system shows whether your demand notice is issued, pending, or approved.
This transparency helps you plan payments without visiting IESCO offices multiple times.
Common Reasons for Application Rejection
IESCO rejects applications only when details are missing or incorrect. Common causes include:
- Incorrect CNIC or property ownership proof
- Unclear or missing documents
- Duplicate connection request for the same property
- Previous unpaid bills on the same address
To avoid this, double-check everything before final submission.
Offline Application Option
If you prefer traditional methods, you can visit your nearest IESCO subdivision office. Request a new connection form, fill it manually, and attach all required documents. However, this process usually takes longer than the online one. The ENC system is faster and more reliable.
IESCO Online Bill and Related Services
Once your connection is active, you’ll receive monthly bills from IESCO. You can view or download them easily through online portals. The best way is to visit the IESCO Online Bill Check page to verify your bill, due date, and payment history.
For users from other areas in Pakistan, the Online Bill Check service lets you check bills for various power companies conveniently.
These services make it easier to manage payments, track consumption, and avoid late fees.
How Long Does the Entire Process Take?
On average, the IESCO new connection process takes 3 to 4 weeks from application submission to meter installation. However, factors like incomplete documents or site issues can delay it.
You can speed up the process by:
- Uploading complete documents at once
- Keeping your site ready before inspection
- Paying the demand notice immediately after issuance
Tips to Avoid Delays in IESCO New Connection
- Always use the correct and latest CNIC copy.
- Verify your address spelling carefully.
- Pay your demand notice fee before the due date.
- Keep communication open with your local IESCO office.
- Track your status online regularly.
What Happens After Meter Installation?
Once installed, IESCO activates your meter and records its reading in their system. You’ll start receiving monthly bills. Check your first bill carefully to ensure details like connection type, tariff, and reading are accurate.
If you spot errors, visit your nearest IESCO office or contact customer service for corrections.
Simplify Your IESCO New Connection Today
Applying for an IESCO new connection is no longer a hassle. With the ENC portal, transparent demand notice fees, and online payment options, the process is efficient and secure. Just follow each step carefully — from filling the form to uploading documents and paying your IESCO new connection demand notice fee.
Electricity is essential for every household and business, and IESCO ensures reliable service for all consumers. If you already have an active connection, remember to check your bills regularly using IESCO Online Bill Check or other Online Bill Check services.
For new applicants, start your process today and enjoy uninterrupted power for your home or business.
(FAQs)
How can I apply for a new IESCO connection online?
You can apply via the ENC portal at enc.com.pk. Fill out the form, upload documents, and track your application easily.
How much is the IESCO new connection demand notice fee?
It depends on your connection type. Domestic users usually pay between PKR 5,000–8,000, while commercial or industrial setups pay higher.
How do I check my IESCO demand notice status?
Log in to the ENC portal, enter your tracking ID, and select “Track Application.” It shows your demand notice progress and payment status.
Can I pay my IESCO demand notice online?
Yes. You can pay through internet banking or at authorized bank branches listed on the notice.
How long does it take for IESCO to install a new meter?
Usually 3 to 4 weeks after payment verification, depending on workload and location.
Can I check my IESCO bill online after getting a new connection?
Absolutely. Visit the IESCO Online Bill Check page to view or download your electricity bill anytime.
What if my IESCO new connection application gets rejected?
You’ll receive an email or SMS explaining the reason. Correct the issue and resubmit your application through the ENC portal.
Is physical verification necessary for all new connections?
Yes, IESCO verifies the site before issuing the demand notice to ensure safety and system integrity.
Can tenants apply for a new connection?
Yes, tenants can apply with a valid rent agreement and landlord’s consent affidavit.
What is the fastest way to get a new IESCO meter?
Apply online, upload all documents correctly, and pay your demand notice fee immediately after issuance to ensure quick processing.
By following this complete IESCO new connection process, you can easily secure an electricity supply without delays or confusion.